Compact, Damp, and Dusty Tunnel Chambers | Dual-Drum Hoisting Winches Ensure Continuous Lifting of Excavated Muck and Materials

Operating environment

Underground tunnel chambers with rough rock walls, confined space, dusty and humid conditions, and a high volume of material handling during construction.

Requirement and pain point

During the tunnel excavation phase, there is a need for continuous improvement in spoil removal, support materials, and small tools; consequently, the equipment must offer high capacity, stable operation, and reliable braking, while the entire machine must be installed and commissioned in a damp, dusty underground environment.

Compact, damp, and dusty tunnel chambers

Supporting equipment

Dual-coil winding-type mining hoist winch, equipped with variable-frequency electrical control, a hydraulic braking system, and a complete set of safety protection devices.

Services

Survey of the underground installation site; layout planning for foundations and fixed supports; guidance for equipment transportation and positioning; electrical wiring and commissioning; safety training for operators; and after-sales spare parts support.

Project benefits

The dual-coil structure ensures smoother operation and balanced load distribution on both sides; on-site installation and commissioning were completed successfully on the first attempt, ensuring continuous operation of both tunnel excavation/extraction and material hoisting.

On This Page

    Contact us

    RELATED CASES

    All Cases

    Key components fully fabricated in-house, nationwide service support. Send us your inquiry for a tailored solution.